One operator faced top-up cement in the annulus between the 9 5/8- and 13 3/8-in. casing strings in an offshore gas well and could not cut and pull casing as planned. Weatherford deployed the Endura dual-string section mill and safely exposed a 98-ft section of formation.
Read On